Now hiring electricians, builders and all trades

Build Calgary's next landmark office

Summit Ridge Corporate Centre is a three-storey office building of oak, stone and glass, with landscaped grounds and underground parking. Join the crew that brings it from drawings to reality.

Find Your Trade PackDownload Brochure (PDF)
0Storeys above ground
0Square feet of workspace
0Underground parking stalls
0Jobs to fill across 12 trades

A workplace shaped by wood, stone and glass

Summit Ridge Corporate Centre will be a modern Class A office building in Calgary, Alberta. Warm oak-toned cladding and pale stone panels frame a glass facade that lights up the evening landscape.

The building has three floors of offices, a lobby, a lounge, a landscaped ground-level terrace and an underground parkade. Construction begins in November 2026, and we are hiring now for every phase.

  • 24,000 sq ft per floor, designed for flexible layouts
  • Floor-to-ceiling glass on every elevation
  • Targeting LEED Gold certification
  • Opening to the first tenants in spring 2028
Find Your Trade Pack Download Brochure

Designed for people, built for Canada

Every detail serves comfort, safety and long-term performance in a cold-climate city.

Oak, stone and glass

Oak-toned cladding, pale stone panels and dark metal frame a glass facade that glows with warm wall lights at dusk.

Daylight and mountain views

Floor-to-ceiling glazing fills the workspaces with light, and upper floors look toward the mountains.

Landscaped grounds

A ground-level terrace with outdoor seating, planted beds, young trees and path lighting welcomes visitors all year.

Flexible workspaces

Open-plan floors, glass meeting suites and quiet rooms let tenants reorganize teams without rebuilding walls.

Safe and accessible

Barrier-free entrances, full sprinkler coverage, emergency lighting and clear exit routes meet the National Building Code.

Built for Canadian winters

A continuous air barrier, R-24 walls, an R-50 roof and heat-recovery ventilation keep heating costs low and the building targets LEED Gold.

Building at a glance

The key facts about the project, in one place.

LocationCalgary, Alberta, Canada
Building typeClass A office building
Height3 storeys above grade
Gross areaAbout 72,000 sq ft
Typical floor24,000 sq ft
Parking120 underground and 80 surface stalls
StructureConcrete and steel frame
FacadeGlass, stone panels and oak cladding
Interior paletteWhite oak, terrazzo, glass
SustainabilityLEED Gold target
AccessibilityBarrier-free throughout
Target openingSpring 2028

Construction timeline and hiring waves

We hire in waves, so each trade joins just before its phase begins.

  1. Site works and excavation

    November 2026 to February 2027

    Clearing, utilities, excavation and the underground parkade.

    Hiring: Equipment operators, concrete finishers, laborers and surveyors.

  2. Foundations and structure

    March to August 2027

    Concrete foundations, suspended decks and the steel and concrete frame rise floor by floor.

    Hiring: Ironworkers, concrete finishers, carpenters and formwork crews.

  3. Envelope and enclosure

    July to December 2027

    Curtain wall glazing, stone and oak cladding and roofing close the building before winter.

    Hiring: Carpenters, framers, glaziers and roofers.

  4. Electrical, mechanical and interiors

    October 2027 to March 2028

    Power, plumbing and HVAC go in, followed by oak millwork, terrazzo and finishes.

    Hiring: Electricians, plumbers, HVAC, drywall, millwork and flooring crews.

  5. Commissioning and opening

    April to June 2028

    Systems testing, final inspections, landscaping and handover to the first tenants.

    Hiring: Superintendents, commissioning crews and cleanup teams.

Plans and resources for your trade

Pick your trade to get the right PDF, or choose a document below. Every file is free.

Find your trade pack

For electricians

Electrical Plan and Scope

Power, lighting and data layout with device legend and circuit notes.

PDF, 1 page, 6 KBDownload PDF

For builders and concrete crews

Floor Plan and Structure

Dimensioned floor plan with room schedule, wall types and framing notes.

PDF, 1 page, 3 KBDownload PDF

For plumbers and HVAC

Plumbing and HVAC Scope Pack

Systems, schedule, codes and certification for mechanical trades.

PDF, 1 page, 3 KBDownload PDF

For finishing crews

Interiors and Finishing Pack

Oak, terrazzo, glass and drywall scope by space, plus quality standards.

PDF, 1 page, 3 KBDownload PDF

For every worker

Site Safety and Orientation Guide

Required reading: PPE, falls, winter work and emergency steps.

PDF, 1 page, 3 KBDownload PDF

For everyone

Project Brochure

Renderings, key facts and the construction timeline.

PDF, 2 pages, 525 KBDownload PDF

Document library

All 8 project documents in one list. Download one at a time or take everything in a single ZIP.

Project BrochureRenderings, key facts and the construction timeline.
PDF, 2 pages, 525 KBDownload
Electrical Plan and ScopePower, lighting and data layout with device legend and circuit notes.
PDF, 1 page, 6 KBDownload
Floor Plan and StructureDimensioned floor plan with room schedule, wall types and framing notes.
PDF, 1 page, 3 KBDownload
Trades Information PackBuilding facts and scope for concrete, iron, carpentry, equipment and labour crews.
PDF, 1 page, 3 KBDownload
Plumbing and HVAC Scope PackSystems, schedule, codes and certification for mechanical trades.
PDF, 1 page, 3 KBDownload
Interiors and Finishing PackOak, terrazzo, glass and drywall scope by space, plus quality standards.
PDF, 1 page, 3 KBDownload
Site Safety and Orientation GuideRequired reading: PPE, falls, winter work and emergency steps.
PDF, 1 page, 3 KBDownload
Application ChecklistDocuments to send, bring to your interview and questions to ask.
PDF, 1 page, 3 KBDownload

How to apply

Pick your trade

Choose your role in the trade finder and see which documents apply.

Download your pack

Read the plans and scope for your trade so you know what to expect.

Send your details

Email your resume, tickets and certificate using the application checklist.

Interview and orientation

Meet our team, confirm your start date and complete site orientation.

Email Your Application Download Checklist

Worker questions

Who can apply?

Anyone with the skills for the role. You must be legally authorized to work in Canada. Ask our hiring team if you have questions about your status.

Do I need a Red Seal or trade certificate?

Journeyperson roles need a trade certificate or equivalent proof of qualification. Apprentices need a current registration with their provincial apprenticeship authority.

Which site tickets are required?

WHMIS, fall protection and first aid are standard. If you are missing one, tell us and we will help you complete it during orientation.

What are the hours and pay?

Standard site hours are Monday to Friday, with overtime scheduled in advance. Pay follows collective agreements or market rates, and we confirm it at your interview.

Can newcomers to Canada apply?

Yes. We welcome applications from newcomers who are authorized to work in Canada. Our team can explain how your credentials are recognized in Alberta.

How soon will I hear back?

We reply to every application within three business days and schedule interviews in the weeks before each construction phase begins.

Questions about the project or a role?

Call or email our hiring team. We reply within three business days.

Site office

100 Ridge Road NW
Calgary, AB T2N 1N4

Hiring line

1-800-555-0142
Mon to Fri, 8 am to 5 pm MT

Email

careers@summitridge.ca

Call Us Now Send an Email
Download PDFs